|
 |
The effective use of test and measuring equipment, including planning by means of computerized support, monitoring, testing, evaluation, capability and wear analysis.
Using CASQ-it IDA. |
|
|
 |
Products and production processes are planned in a process-oriented way, from the development up to the product's maturity, and are monitored in success-oriented way in relation to quality and time according to a check list system.
Using CASQ-it APQP. |
|
|
 |
The FMEA by Boehme & Weihs detects potential risks at an early stage and helps to learn from the defects occurred. The Failure Mode and Effect Analysis leads to the optimal risk minimization right from the beginning. Using CASQ-it FMEA. |
|
|
|
 |
CAQ for comprehensive quality assurance meeting QS9000 and VDA standards: CASQ-it gives you a complete overview of all quality-assuring measures regarding process steps – from the receiving of material, via the production right up to the delivery. Using CASQ-it CPL. |
|
|
 |
Straightforward creation of inspection plans including test instructions using the existing test documents. Display of operation and testing levels, computerized support for working effectively: the inspection planning costs are automatically recorded at the same time.
Using CASQ-it IPL. |
|
|