 |
CASQ-it CPL produces the complete instant summary of all quality-assuring measures for any manufacturing step - separated by prototype, preliminary series and series manufacture. Control plan co-ordinates inspection planning types from IGI, QDA/SPC, II and OGI: from outside products via semi-finished production including the accompanying laboratory examinations, right to the complete delivery system with final testing of the assembly part. |
|
 |
Assured planning by conformity to standards. Optimized working by flexible alternation between detail and overview planning / top-down and bottom-up method. Straightforward information flow by direct connection to inspection planning. |
|
|
 |
Management of the inspection plan types sourcing, production, process planning, outgoing goods. The CPL permits continuous quality planning with a complete survey over all test locations of a product - no matter which departments and inspection plan types are involved. |
|
 |
Meeting QS 9000, VDA and HACCP standards: By the specified QS 9000 form, the control plan meets the QS 9000 requirement for a standardized systematic presentation of all tests, fabrication and testing steps to make a product. |
|
|